The Significance Level of Critical Success Factors Affecting Contractor Performance in Winning Public Construction Tenders
Downloads
This study analyzes the Critical Success Factors (CSFs) influencing contractor performance in public construction tendering under the Ministry of Public Works in Indonesia. Using a quantitative approach and Structural Equation Modeling–Partial Least Squares (SEM-PLS), data were collected from 597 contractors, comprising 161 small, 187 medium, and 249 large firms. The results reveal that the significance of CSFs varies across contractor classifications. For small contractors, performance is significantly influenced by Equipment Resources (X2), Technology and Innovation (X4), Competitive Pricing (X6), and Regulatory Understanding (X7). For medium contractors, the most influential factors are Company Qualification (X1), Equipment Resources (X2), Human Resources (X3), Document Quality (X5), and Competitive Pricing (X6). Meanwhile, for large contractors, performance is mainly driven by Equipment Resources (X2), Technology and Innovation (X4), Document Quality (X5), Competitive Pricing (X6), and Regulatory Understanding (X7). Across all classifications, Competitive Pricing and Equipment Resources consistently emerge as key determinants of tender success. The model fit indices (NFI = 0.712–0.759) confirm the robustness and validity of the developed models. These findings provide empirical evidence of how CSFs differ by organizational scale, offering theoretical contributions to construction management research and practical insights for improving competitiveness, transparency, and efficiency in Indonesia’s public procurement system.
Abduh, M., Sukardi, S. N., Wirahadikusumah, R. D., Oktaviani, C. Z., & Bahagia, S. N. (2023). Maturity of procurement units for public construction projects in Indonesia. International Journal of Construction Management, 23, 2171–2184. https://doi.org/10.1080/15623599.2022.2046941
Adediran, A. (2018). Modelling targeted procurement strategies and relationship quality criteria influencing the development of small contractors in South Africa.
Afolabi, A., et al. (2019). Critical success factors (CSFs) for e-procurement adoption in the Nigerian construction industry. Buildings, 9(2), 47. https://doi.org/10.3390/buildings9020047
Aje, I. O., Oladinrin, T. O., & Nwaole, A. N. C. (2016). Factors influencing success rate of contractors in competitive bidding for construction works in South-East, Nigeria. Journal of Construction in Developing Countries, 21(1), 19–34.
Ali, A. (2024). Investigating project management practices in public sector organisations of a less developed country.
Amalia, R., Alfan, M. A., Aliefia, M., Radzi, M. S. N. M., & Kurniawan, F. (2023). Digitalization of the public procurement system in Indonesia: Challenges and problems. Yuridika, 38(3), 499–518. https://doi.org/10.20473/ydk.v38i3.51874
Arifuddin, R., Artahsasta, E., Fadlillah, M. R., & Burhanuddin, S. (2025). Determining factors of contractor tender winning in construction projects. Journal of Engineering and Sustainable Development, 29(5), 565–572. https://doi.org/10.31272/jeasd.2880
Arifuddin, R., Muharram, M. H., & Abdurrahman, M. A. (2025). Analysis of factors affecting construction project tender winning in small qualification contractors. Engineering, Technology & Applied Science Research, 15(1), 20197–20202. https://doi.org/10.48084/etasr.9357
Bhatta, J. P., & Sain, M. (2023). Public procurement and project management at transitional context: Analysis of single source contracting practices. A Bi-Annual South Asian Journal of Research & Innovation, 10(1), 9–18.
Ellis, J., et al. (2021). A case study of a negotiated tender within a small-to-medium construction contractor: Modelling project cost variance. Buildings, 11(6), 260. https://doi.org/10.3390/buildings11060260
Guevara, J., Garzón, D., & Castelblanco, G. (2025). Reexamining the procurement paradigm: Lessons from urban public transportation projects. Journal of Management in Engineering, 41(6), 4025048.
Hair, J. F., Hult, G. T. M., Ringle, C. M., & Sarstedt, M. (2020). A primer on partial least squares structural equation modeling (PLS-SEM) (2nd ed.). Sage Publications.
Hair, J. F., Ringle, C. M., & Sarstedt, M. (2014). PLS-SEM: Indeed a silver bullet. Journal of Marketing Theory and Practice, 19(2), 139–152. https://doi.org/10.2753/MTP1069-6679190202
Henseler, J., Hubona, G., & Ray, P. A. (2016). Using PLS path modeling in new technology research: Updated guidelines. Industrial Management & Data Systems, 116(1), 2–20. https://doi.org/10.1108/IMDS-09-2015-0382
Kasmono, A., Purwono, R., & Herawati, N. (2025). Electronic procurement to improve sustainability and digital transformation in government procurement. Journal of Distribution Science, 23(4), 91–102. https://doi.org/10.15722/jds.23.04.202504.91
Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah. (2024). Panduan penggunaan sistem pengadaan secara elektronik (SPSE). LKPP.
Luo, G., Serrao, C., Liang, D., & Zhou, Y. (2023). A relevance-based technology–organisation–environment model of critical success factors for digital procurement adoption in Chinese construction companies. Sustainability, 15(16), 12260. https://doi.org/10.3390/su151612260
Mergawy, R. T., Hosny, H. E., & Abdelazeem, A. S. (2023). Decision support model for contractor selection. The Open Civil Engineering Journal, 17(1). https://doi.org/10.2174/18741495-v17-e230215-2022-51
OECD. (2016). Preventing corruption in public procurement. OECD Publishing.
Runeson, G., & Skidmore, M. (1999). Tendering theory revisited. Construction Management and Economics, 17(3), 285–296.
Copyright (c) 2026 Memed Timang Palembangan, Israel Padang

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International (CC-BY-SA). that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.







