In 2017, the Indonesian government introduced changes to the Gross Split Production Sharing Contract (PSC) system through the enactment of Minister of Energy and Mineral Resources Regulation No. 13 of 2024, which revoked Minister of Energy and Mineral Resources Regulation No. 8 of 2017 and its amendments. The fundamental change in the new Gross Split PSC lies in the assessment of variable and progressive components as adjustments to the profit-sharing provided to Contractors (KKKS). The primary legal issue in this study is the legal certainty of changes in the profit-sharing provisions within the Cooperation Contract (KKS) under the Gross Split scheme for field development plans signed before the enforcement of Minister of Energy and Mineral Resources Regulation No. 13 of 2024. Additionally, there are new obligations for KKKS, such as the use of independent surveyors and the management of unconventional oil and gas, which were not previously included in the KKS. This study aims to examine the legal certainty of changes in the profit-sharing provisions in the Gross Split KKS signed before the regulatory changes, using a normative research method with conceptual, statutory, and case study approaches. The findings indicate that the implementation of the Gross Split PSC requires clear legal certainty in the terms and conditions of the KKS regarding the impact of regulatory changes on previously signed contracts. Thus, there is alignment between the private contractual relationship of the government and private entities while preserving the state’s sovereignty as the holder of oil and gas mining authority.

 

References

Bisnis.com. (2020). Kontraktor migas berharap fleksibilitas tidak hanya di atas kertas. dan Sumber Daya Mineral, K. E. (2020). Peraturan Menteri ESDM No. 12 Tahun 2020 tentang perubahan ketiga atas Permen 8/2017 tentang kontrak bagi hasil gross split.

ESDM. (2022). Pemerintah terbuka terhadap masukan untuk penyempurnaan T&C kontrak hulu migas.

ESDM, K. (2020). Resmi diteken, kini investor dapat pilih bentuk kontrak migas.

ESDM, P. M. (2024). No. 13 Tahun 2024 Tentang kontrak bagi hasil gross split.

Fajri, M. (2020). Analisis Hukum Skema Kontrak Gross Split Terhadap Peningkatan Investasi Hulu Minyak dan Gas Bumi. Jurnal Hukum & Pembangunan, 50(1), 123–145.

Hukumonline. (2020a). Paradigma baru kepastian hukum kontrak kerja sama hulu migas.

Hukumonline. (2020b). Resmi diteken, kini investor dapat pilih bentuk kontrak migas.

Institute, R. (2023). Kerangka dasar revisi UU Migas: Kepastian hukum & investasi.

Manohara, B. P., & Hayati, T. (2019). Gross Split: A New Contracting System in the Indonesian Oil and-Gas Sector. Environmental Policy and Law, 49(1), 44.

Mentari, D., & Andjarwati, A. (2023). Analisis Yuridis terhadap regulasi skema kontrak bagi hasil (Production Sharing Contract) dalam tata kelola pertambangan minyak dan gas bumi di Indonesia.

Nasriyati, M. (2021). Tantangan Kepastian Hukum dalam Implementasi Kontrak Bagi Hasil Gross Split di Indonesia. Jurnal Hukum Energi, 8(2), 45–60.

Nostalgi, B. (2022). Kepastian hukum pengelolaan sektor hulu migas dengan kontrak bagi hasil split yang bersifat lintas sektor dan implementasinya terhadap pertumbuhan investasi di sektor hulu migas. Dharmasisya, 1(1), 1–18.

Online, M. T. (2020). Regulasi soal gross split kembali direvisi, ini perubahannya.

Rahayu, S. A. P., & DKK. (2020). Filosofi Kontrak Bagi Hasil Gross Split Dari Sudut Pandang Hukum Kontrak. Arena Hukum, 1, 1–10.

Sari, D. (2022). Kepastian Hukum Kontrak Bagi Hasil Gross Split: Studi Implementasi terhadap Investasi Lintas Sektor. Jurnal Hukum dan Kenotariatan, 10(1), 34–50.

Sugiyartomo, F. H. (2019). The legality of oil & gas production sharing contract gross split scheme. Indonesian Journal of Energy, 2(1), 29–37.

Tempo.co. (2024). ESDM terbitkan aturan terbaru untuk tarik investasi hulu migas: Ada soal bagi hasil?

Wibowo, R. (2023). Evaluasi Skema Gross Split dalam Kontrak Kerjasama Hulu Migas: Perspektif Kepastian Hukum dan Efisiensi. Jurnal Hukum Energi dan Sumber Daya, 9(4), 178–195.

Downloads

Published

2025-06-17